Header Ads

Header ADS

over lock stitch consumption


I.E department 

Tex-know

If there are 35 yds of over lock sewing in a garments then ,how many meter of thread are needed for over lock sewing ? if one inch stitch needed 13 inch thread.
Now , 1 yds = 36 inch .
 Then 35 yds = 35×36  = 1260 inch .
     1 inch =  13 inch thread
So that 1260 inch needed = 13×1260 = 16380 inch thread .
Needed thread consumption in meter = 16380 inch ÷39.37 inch =   416.05 meter thread needed .  (  1 meter =39.37 inch  )  


No comments

Powered by Blogger.